An Introduction To MS4 Permit Requirements

An MS4 is a Municipal Separate Storm Sewer System that grants a municipality or a municipal like entity permission to develop and implement a storm management program. This storm management program is designed to prohibit illicit discharges and stop the contamination of stormwater runoff.

MS4 permit requirements stipulate that an approved storm management program must include a minimum of six (6) minimum storm control measurements (MCMs) to properly support the running of a stormwater management program. Two of these MCMs include public education and outreach, as well as public involvement and participation to ensure that the stormwater management program is properly integrated into the life of the municipality and the people who live there.

The other four MCMs speak to the physical aspects and technical operations of the stormwater management program and include the following:

1. Illicit Discharge and Detection Elimination
2. Construction Site Runoff Control
3. Post Construction Stormwater Management
4. Good Housekeeping/Pollution Prevention

Recent Posts

woman meditating on floor with overlooking view of trees
Corporate Retreat Venues Across NSW
a chair and a window
Flipchart Hire in Parramatta
green grass field during golden hour
Romantic Getaways Hunter Valley Escape
brown and gray concrete store
Romantic Restaurants Miami Locals Love
pink and brown makeup brush set
Makeup Artist For Local Clients

Author

chris

Writer & Blogger

Related Posts

devops-3148408_1280
Importance of Implementing Configuration Management
medical-4600914_1280
Europe Comes Together for Research and Innovation
radio-4695874_1280
Ultimate Guide to GME CB Radio
credit-card-1730085_1280
Processing Payments Efficiently Made Simple